Explore / ISTQB Certified Tester Foundation Level (CTFL) v4.0 Exam Prep / Practice questions
ISTQB Certified Tester Foundation Level (CTFL) v4.0 practice questions
10 questions from the bank behind this course's timed mock. Free to read and to answer, no account needed, and each has its answer and an explanation. They belong to ISTQB Certified Tester Foundation Level (CTFL) v4.0 Exam Prep.
Answer them one at a time →Read lesson 1 free
Question 1
A tester in Madrid whose native language is Spanish books the CTFL v4.0 exam in English. She wants to plan her pacing before exam day. Which statement best describes the time she should expect, according to ISTQB's rule?
- 75 minutes, because 25% extra time is allowed for non-native speakers
- 60 minutes, because the time limit is the same for every candidate
- 60 minutes, but with a lower pass mark of 24 correct answers
- 90 minutes, because 50% extra time is allowed for non-native speakers
Show the answer
Answer: A. 75 minutes, because 25% extra time is allowed for non-native speakers
ISTQB allows 25% extra time (75 minutes in total) for candidates sitting the exam in a language that is not their native one, and she should confirm this with her exam provider. The standard 60 minutes applies only to candidates sitting in their native language, and the pass mark does not change.
Question 2
A tester on the banking "reset password" feature already has a set of test cases. She now records that the tests will need one registered account, one locked account and one unregistered email address, and that the test environment must include a service that captures outgoing emails. No accounts have been created and nothing has been installed. Which test activity is she performing?
- Test design
- Test planning
- Test analysis
- Test implementation
Show the answer
Answer: A. Test design
Test design defines the test data requirements and designs the test environment without building anything. Test implementation is the nearest distractor, but it is where the data is actually created and the environment is built and verified.
Question 3
A developer on a hotel booking application has finished two modules: a room-pricing module and an invoice module. Each has already passed its own isolated tests. She now needs to check that the invoice module receives the nightly rate from the pricing module in the correct format and that the calls happen in the correct order. Both modules belong to the same application. Which test level is she performing?
- System testing
- Component testing
- System integration testing
- Component integration testing
Show the answer
Answer: D. Component integration testing
The test object is the interface between two components of the same system, which is component integration testing. System integration testing is wrong because it covers interfaces to other systems or external services, and none is involved here.
Question 4
A test manager is setting up a review of a 40-page test plan. One person must take overall responsibility for the review, choose which colleagues take part, and arrange when and where it happens. Which review role does this describe?
- Moderator (facilitator)
- Review leader
- Manager
- Scribe (recorder)
Show the answer
Answer: B. Review leader
The review leader takes overall responsibility for the review, decides who is involved and organizes when and where it takes place. The manager is the nearest distractor, but the manager decides what is to be reviewed and provides resources such as staff and time.
Question 5
A car park charges by whole hours: 1 to 3 hours costs £2, 4 to 8 hours costs £5 and 9 to 24 hours costs £12. A duration of 0 hours, or of 25 hours and above, is rejected, and no other limits are stated. A tester inherits a test suite that uses the durations 1, 2, 4, 9, 12 and 25. What is the minimum number of additional test cases needed to reach 100% 2-value BVA coverage?
- 2
- 4
- 3
- 6
Show the answer
Answer: B. 4
The identified boundary values are 0, 1, 3, 4, 8, 9, 24 and 25, and the suite exercises only 1, 4, 9 and 25, so tests for 0, 3, 8 and 24 are needed. The answer 2 wrongly treats the mid-partition values 2 and 12 as if they covered boundary values.
Question 6
A tester is using the card-and-PIN model from the course (states: Idle, Waiting for PIN, Menu, Blocked). The system starts in Idle and receives these events in order: insert card, wrong PIN, correct PIN, cancel, insert card. The tester must record the expected actions for the test case. Which sequence of actions is correct?
- ask for PIN, show error, show menu, return card, ask for PIN
- ask for PIN, show menu, return card, ask for PIN
- ask for PIN, show error, show menu, retain card, ask for PIN
- ask for PIN, show error, show menu, return card
Show the answer
Answer: A. ask for PIN, show error, show menu, return card, ask for PIN
Each of the five events triggers one valid transition and one action, ending in Waiting for PIN after the second card insertion. The four-action option stops at Idle and omits the action of the final insert card event.
Question 7
A test lead is preparing a session-based testing session for a new loyalty-points feature in a retail app. The requirement is a single sentence and the session will last 60 minutes. Which of the following is the BEST test charter for this session?
- Test the loyalty-points feature for as long as it takes until no more defects can be found.
- Step 1: Log in as user A. Step 2: Buy an item for 10.00. Step 3: Open the balance page. Expected result: balance shows 10 points.
- Explore the earning and redeeming of loyalty points to discover failures in points calculation and balance display.
- Redeemed more points than the balance held: accepted, balance shown as negative. Defect reported. Not covered: refunds.
Show the answer
Answer: C. Explore the earning and redeeming of loyalty points to discover failures in points calculation and balance display.
A test charter states the test objectives for the session and guides the tester without listing steps or expected results. The step-by-step option is a scripted test case, and the option recording a negative balance is a session sheet entry written during the session, not a charter.
Question 8
A test manager is drafting the test plan for an insurance claims system and records four statements. Which statement should be recorded as an assumption, not as a constraint?
- The anonymized claims data set will be delivered by the data team before system testing starts.
- Only the two licensed seats of the test management tool may be used during the project.
- Testing must be completed by 31 March because the new regulation takes effect on 1 April.
- The approved test budget is fixed and covers a maximum of three testers for the whole project.
Show the answer
Answer: A. The anonymized claims data set will be delivered by the data team before system testing starts.
The delivery of the data set is believed to be true without proof and may turn out false, which makes it an assumption. The regulatory deadline is the nearest distractor, but it is a fixed limit on the testing, so it is a constraint.
Question 9
A tester on an Agile team observes five representative customers as they try to complete a booking in the release candidate. The goal is to judge how easy the product is to use. A developer argues that, because usability is a non-functional characteristic, this testing sits with the performance tests in the model. In which testing quadrant does this testing belong?
- Q3: business-facing, critiques the product
- Q4: technology-facing, critiques the product
- Q2: business-facing, supports the team
- Q1: technology-facing, supports the team
Show the answer
Answer: A. Q3: business-facing, critiques the product
Usability testing is user-oriented and evaluates the built product, so it is listed in Q3 with exploratory and user acceptance testing. Q4 holds smoke tests and non-functional tests except usability tests, so the developer's reasoning fails on the one named exception.
Question 10
A build was rejected for system testing because it did not meet the entry criteria. The developers deliver a reworked build, and the test manager directs the team to re-evaluate whether the build now meets the entry criteria before execution starts. Which activity does this directive belong to?
- Test planning, because the entry criteria are being defined again for the new build
- Test completion, because the rework marks the end of a finished test activity
- Test monitoring, because the team is checking the status of the build against agreed criteria
- Test control, because re-evaluating entry or exit criteria after rework is a control directive
Show the answer
Answer: D. Test control, because re-evaluating entry or exit criteria after rework is a control directive
Re-evaluating whether a test item meets entry or exit criteria after rework is a typical control directive, because it is a corrective action issued from monitoring information. Monitoring is the nearest distractor, but it only gathers information and does not issue directives.
The full timed mock
40 questions in 60 minutes, with a pass mark of 65%. Each paper is drawn from a bank of questions written for the mock alone, and these 10 are left out of it. Full access opens it, with every level of the course.
LevelUpWith is independent of the organisation that sets this exam. These questions were written for this course; they are not taken from the exam.