Explore / Project & Service Management
PMI Certified Associate in Project Management (CAPM) Exam Prep

Build every concept the CAPM exam tests from first principles, across fundamentals, predictive, agile and business analysis, with worked calculations and original scenario questions, ending in a timed mock exam. Independent of PMI, not an Authorized Training Partner, and no pass is promised.
Expert · 47 levels · 4 free · Created Oct 2026 · Professionally curated by levelupwith.com
What's inside
- Level 1: The CAPM Exam: Format, Rules and How to PrepareFree
[Project Management Fundamentals and Core Concepts] Learn what the CAPM exam is (150 questions, 135 of them scored, 3 hours with one 10-minute break), its four weighted domains, its question styles, and what this independent course does and does not provide.- State the exam format (150 questions with 135 scored, 3 hours, a 10-minute break) and the weight of each domain: 36%, 17%, 20% and 27%
- Describe the question styles (multiple choice, drag and drop, animation or video scenarios, and hot spots where you click on a diagram) and how to approach each
- Explain that PMI requires a secondary degree and 23 hours of project management education, which this course does not certify, so you must check eligibility with PMI
- Explain that the exam outline and PMI's guides are PMI's copyright and are not reproduced here, so you download the current outline from pmi.org, and that this course is independent of PMI, is not an Authorized Training Partner and promises no pass
- Level 2: What Makes Work a Project: Projects vs OperationsFree
[Project Management Fundamentals and Core Concepts] Learn the defining features of a project (temporary, with a unique outcome) and how it differs from ongoing operations.- Define a project from first principles using the ideas of temporary effort and a unique product, service or result
- Classify everyday work scenarios as either a project or operations and justify the choice
- Explain how a project hands its finished output over to operations and why projects are how organisations create value and change
- Level 3: Projects, Programs and PortfoliosFree account
[Project Management Fundamentals and Core Concepts] Learn how projects, programs and portfolios relate, and what each level is managed to achieve.- Distinguish a project (delivers an output), a program (coordinates related work for shared benefits) and a portfolio (selects work to meet strategic goals)
- Identify from a scenario whether a decision belongs at project, program or portfolio level
- Explain how operations can sit inside a program or portfolio alongside projects
- Level 4: Project Life Cycles: Predictive, Adaptive and HybridFree account
[Project Management Fundamentals and Core Concepts] Learn what a project life cycle and its phases are, and compare the predictive, iterative, incremental, adaptive and hybrid ways of moving through them.- Define life cycle, phase and phase gate, and distinguish a project life cycle from a product life cycle
- Describe the five process groups (initiating, planning, executing, monitoring and controlling, closing) and explain why they are not the same as phases
- Compare predictive, iterative, incremental, adaptive and hybrid life cycles by how each handles scope, change and delivery
- Level 5: Issues, Risks, Assumptions and Constraints
[Project Management Fundamentals and Core Concepts] Learn to tell apart four terms the exam often tests together: issue, risk, assumption and constraint.- Define issue (happening now), risk (uncertain future event, either threat or opportunity), assumption (taken as true without proof) and constraint (limiting factor)
- Sort statements from a project scenario into the correct category and name the log or register where each is recorded
- Explain how an unverified assumption can become a risk and how a risk that occurs becomes an issue
- Level 6: Professional Ethics in Project Management
[Project Management Fundamentals and Core Concepts] Learn the four values of the PMI Code of Ethics and Professional Conduct (responsibility, respect, fairness and honesty) and apply them to dilemma scenarios.- Explain each of the four values in your own words with a workplace example
- Recognise conflicts of interest, misreporting and disrespectful conduct in a scenario and choose the best ethical response
- Distinguish between standards you must meet and standards you should strive for when answering ethics questions
- Level 7: Planning Scope, Schedule and Resources
[Project Management Fundamentals and Core Concepts] Learn what a project management plan is and how scope, schedule and resource planning fit together at a conceptual level.- Explain the purpose of the project charter and the project management plan and what a baseline is
- Describe how defining scope leads to activities, durations and a schedule, and identify milestones
- Distinguish resource types (people, equipment, materials) and read a simple responsibility assignment (RACI) chart
- The learner can tell apart what a project management plan contains and governs from what a product management plan covers, and sort sample deliverables into the correct plan.
- The learner can explain what happens when a project is initiated (business case, charter, authorisation) and how intended benefits are identified, planned and later measured.
- Level 8: Planning Cost and Quality
[Project Management Fundamentals and Core Concepts] Learn how a project budget is estimated and built, and how quality is planned into the work rather than inspected in afterwards.- Compare analogous, parametric, bottom-up and three-point estimating, and calculate a three-point estimate from worked figures
- Explain how estimates and contingency reserve build into a cost baseline, and how management reserve is added to reach the budget
- Distinguish quality from grade, prevention from inspection, and quality assurance from quality control, and explain the cost of quality
- Level 9: Planning for Risk and the Risk Register
[Project Management Fundamentals and Core Concepts] Learn the steps of risk planning, from identifying risks to choosing responses, and how the risk register records them.- List what a risk register holds (risk, cause, probability, impact, owner, response) and fill one in for a sample risk
- Score risks with a probability and impact matrix and calculate expected monetary value in a worked example
- Match response strategies to threats (avoid, transfer, mitigate, accept, escalate) and to opportunities (exploit, share, enhance, accept, escalate)
- Level 10: Stakeholders and the Stakeholder Register
[Project Management Fundamentals and Core Concepts] Learn who counts as a stakeholder, how to analyse them and how the stakeholder register and communications planning guide engagement.- Define stakeholder and describe what a stakeholder register contains
- Place stakeholders on a power/interest grid and choose an engagement approach for each quadrant
- Outline a simple communications plan stating who needs what information, when and by which method
- Level 11: Closing a Project or Phase
[Project Management Fundamentals and Core Concepts] Learn the activities that formally close a project or phase and why closure matters even when a project is ended early.- Put the main closure activities in a sensible order: confirm acceptance, transfer the deliverable, close contracts, release resources and archive records
- Explain the purpose of lessons learned and the final report, and where that knowledge is stored for future projects
- Decide what closure work is still required when a project is cancelled before completion
- Level 12: Project Roles: Project Manager, Sponsor and Team
[Project Management Fundamentals and Core Concepts] Learn the responsibilities of the project manager, the sponsor, the project team and supporting bodies such as the project management office.- Describe what the sponsor provides (funding, authority, escalation path) versus what the project manager is accountable for
- Identify from a scenario who should make or approve a given decision
- Explain how functional, matrix and project-oriented organisation structures change the project manager's authority
- The learner can describe each of the roles a project manager plays (initiator, negotiator, listener, coach, working member and facilitator) and identify which one a scenario calls for.
- Level 13: Leadership versus Management
[Project Management Fundamentals and Core Concepts] Learn the difference between leading and managing, the common leadership styles and when each suits a team.- Contrast management (directing work, maintaining control) with leadership (guiding, motivating, building a shared vision)
- Recognise leadership styles such as servant, transformational, transactional, laissez-faire and directive in scenarios
- Choose a fitting style for a team's stage of development (forming, storming, norming, performing, adjourning)
- Level 14: Emotional Intelligence and Team Performance
[Project Management Fundamentals and Core Concepts] Learn the components of emotional intelligence and how they affect conflict, motivation and team performance.- Define self-awareness, self-management, social awareness and social skill with an example of each
- Apply emotional intelligence to pick the best response in a team-conflict scenario
- Compare conflict approaches (collaborate, compromise, smooth, force, withdraw) and say when each is appropriate
- Level 15: Following Planned Strategies During Delivery
[Project Management Fundamentals and Core Concepts] Learn how a project manager acts on the plans already made, carrying out planned risk responses, communications and stakeholder engagement, and what to do when reality departs from the plan.- Decide the correct first action when a planned-for risk occurs, by consulting the risk register and carrying out the agreed response
- Use the communications plan and stakeholder engagement approach to handle a scenario instead of improvising
- Explain when to follow the plan, when to raise a change request and when to escalate to the sponsor
- Level 16: Problem-Solving Tools and Effective Meetings
[Project Management Fundamentals and Core Concepts] Learn the standard problem-solving tools and techniques, and how to run meetings that reach decisions.- Use root cause analysis tools (the five whys and the cause-and-effect or fishbone diagram) on a sample problem
- Read a Pareto chart and explain how it focuses effort on the few causes that produce most of the problems
- State the purpose of common meeting types, the role of a focus group, and the elements of an effective meeting (agenda, timebox, facilitator, recorded actions)
- Level 17: When a Predictive Approach Fits
[Predictive, Plan-Based Methodologies] Learn the project conditions that make a predictive, plan-based approach the right choice.- List the signals that favour a predictive approach: stable and well-understood requirements, a high cost of change, regulatory or safety demands, and a single final delivery
- Evaluate a project scenario and justify whether a predictive approach suits it
- Describe the sequence of phases in a predictive project and what each phase gate is for
- The learner can judge how well a predictive approach suits a given organisational structure, such as virtual or colocated teams and matrix or hierarchical organisations, and justify the judgement.
- Level 18: The Work Breakdown Structure (WBS)
[Predictive, Plan-Based Methodologies] Learn how to break the total project scope down into a work breakdown structure of deliverables and work packages.- Define WBS, work package, control account and WBS dictionary, and explain the 100 percent rule
- Decompose a simple project into a deliverable-based WBS two or three levels deep
- Explain how the scope statement, WBS and WBS dictionary together form the scope baseline, and why work not in the WBS is out of scope
- Level 19: Sequencing Activities and Network Diagrams
[Predictive, Plan-Based Methodologies] Learn how work packages become activities linked by dependencies and drawn as a schedule network diagram.- Distinguish the four dependency relationships: finish-to-start, start-to-start, finish-to-finish and start-to-finish
- Classify dependencies as mandatory, discretionary, external or internal, and apply leads and lags
- Draw a precedence network diagram from a table of activities and their predecessors
- Level 20: Critical Path and Float: Worked Calculations
[Predictive, Plan-Based Methodologies] Learn to calculate the critical path, project duration and float on a network diagram using the forward and backward pass.- Perform a forward pass and a backward pass to find the early start, early finish, late start and late finish of each activity
- Calculate total float and free float, and identify the critical path as the longest path with zero total float
- Predict how a delay to a given activity affects the project end date, and explain crashing and fast tracking as ways to shorten the schedule
- Level 21: Earned Value Basics and Schedule Variance
[Predictive, Plan-Based Methodologies] Learn the three building blocks of earned value management (planned value, earned value, actual cost) and use them to calculate schedule variance (SV = EV − PV) and the schedule performance index (SPI = EV ÷ PV) through worked examples.- Define planned value, earned value and actual cost in plain words and identify each from a short project scenario
- Calculate schedule variance and SPI from given figures and state whether the project is ahead of, on, or behind schedule
- Explain why a schedule variance expressed in money does not by itself show whether the critical path is delayed
- Level 22: Cost Variance, CPI and Forecasting the Finish
[Predictive, Plan-Based Methodologies] Extend earned value to cost by calculating cost variance (CV = EV − AC) and the cost performance index (CPI = EV ÷ AC), then forecast the outcome with budget at completion, estimate at completion, estimate to complete and variance at completion.- Calculate cost variance and CPI and interpret a negative variance or an index below 1 as over budget
- Work out estimate at completion (BAC ÷ CPI), estimate to complete and variance at completion from a worked example
- Read a combined SV and CV scenario and choose the statement that best describes the project's status
- Level 23: Baselines and Monitoring Against the Plan
[Predictive, Plan-Based Methodologies] Understand how the scope, schedule and cost baselines together form the performance measurement baseline, and how a predictive project is monitored by comparing actual results with those baselines.- Distinguish the scope baseline, schedule baseline and cost baseline and say what each one contains
- Explain how thresholds, variance analysis and status reports show when performance has drifted from the plan
- Choose between corrective action, preventive action and defect repair for a described deviation
- Level 24: Integrated Change Control in Predictive Projects
[Predictive, Plan-Based Methodologies] Follow a change request from the moment it is raised, through impact analysis and a change control board decision, to the updated baseline and change log, and recognise scope creep when this process is bypassed.- Put the steps of handling a change request in the correct order, as a drag-and-drop style exam question would ask
- Explain the roles of the change control board, the project manager and the sponsor in approving or rejecting a change
- Tell a controlled, approved change apart from scope creep in a scenario and select the best next action
- Level 25: When an Adaptive Approach Fits
[Agile Frameworks/Methodologies] Learn the agile mindset from first principles (the four values and the principles behind the Agile Manifesto) and the project conditions, such as uncertain requirements and a need for frequent feedback, that make an adaptive approach a better fit than a predictive or hybrid one.- Summarise the four Agile Manifesto values in your own words and recognise behaviour that supports or contradicts them
- Compare the advantages and drawbacks of adaptive and predictive approaches for a described project
- Identify the organisational and project factors that make adaptive working easier or harder, and when a hybrid approach is the best answer
- The learner can define organizational process assets and enterprise environmental factors, give examples of each, and identify which ones in a scenario make an adaptive approach easier to adopt.
- Level 26: Iterations, Releases and Logical Units of Work
[Agile Frameworks/Methodologies] Understand how adaptive projects divide work into time-boxed iterations grouped into releases, the benefits and drawbacks of working this way, and how the deliverables of a work breakdown structure translate into epics, features and user stories.- Distinguish an iteration, a release and an increment, and explain what a time-box is
- State the pros and cons of iterative delivery compared with delivering once at the end
- Convert a small work breakdown structure into epics, features and user stories that could be planned into iterations
- Level 27: Planning an Iteration: Estimating and Committing
[Agile Frameworks/Methodologies] Learn how a team plans a single iteration: the inputs that determine its scope, relative estimation with story points and planning poker, and using team capacity to decide how much work to commit to.- List the inputs to iteration planning, including the ordered backlog, team capacity, past velocity and the iteration goal
- Explain relative estimation and estimate a set of stories in story points using a reference story
- Decide how many stories fit into an iteration from a given capacity and justify the choice
- Level 28: Adaptive Controls: Velocity, Burn Charts and Reviews
[Agile Frameworks/Methodologies] Learn how adaptive projects are tracked and controlled, calculating velocity, reading burndown and burnup charts, and using task boards, iteration reviews and retrospectives as controls, and how this differs from tracking against a predictive baseline.- Calculate average velocity from past iterations and use it to forecast how many iterations the remaining backlog needs
- Interpret a burndown or burnup chart, including the kind of chart region a hot-spot question would ask you to click
- Contrast adaptive tracking by working increments and feedback with predictive tracking by baseline variance
- Level 29: Scrum: Accountabilities, Events and Artifacts
[Agile Frameworks/Methodologies] Learn the parts of Scrum: the product owner, scrum master and developers; the sprint, sprint planning, daily scrum, sprint review and sprint retrospective; and the product backlog, sprint backlog and increment.- Match each Scrum accountability to what that person or group is responsible for
- State the purpose of each Scrum event and place the events in the order they occur within a sprint
- Explain what the product backlog, sprint backlog and increment are, and how the definition of done applies to the increment
- Level 30: Kanban: Visualising Flow and Limiting Work
[Agile Frameworks/Methodologies] Learn how Kanban manages a continuous flow of work with a visual board, work-in-progress limits and a pull system, and how lead time, cycle time and throughput reveal bottlenecks.- Describe a Kanban board and explain how a work-in-progress limit and pulling work prevent overload
- Distinguish lead time, cycle time and throughput and calculate them from a simple example
- Contrast Kanban's continuous flow with Scrum's time-boxed sprints and choose which suits a described situation
- Level 31: Extreme Programming (XP): Practices for Quality
[Agile Frameworks/Methodologies] Learn the values and core technical practices of Extreme Programming (pair programming, test-driven development, continuous integration, refactoring, small releases and sustainable pace) and why XP concentrates on engineering quality.- Explain in plain words what pair programming, test-driven development, continuous integration and refactoring each mean
- Recognise XP's values and its team roles, such as the coach and the on-site customer
- Identify from a scenario that XP is the framework being described rather than Scrum or Kanban
- Level 32: SAFe and Choosing Between Adaptive Frameworks
[Agile Frameworks/Methodologies] Learn how the Scaled Agile Framework (SAFe) coordinates many teams through Agile Release Trains and PI Planning, and contrast Scrum, Kanban, XP and SAFe side by side so the right one can be picked in an exam scenario.- Explain why scaling is needed when many teams build one solution, and what an Agile Release Train and PI Planning do
- Compare Scrum, Kanban, XP and SAFe by scale, cadence, roles and main focus
- Select the framework that best matches a described organisation and explain why each alternative fits less well
- Level 33: Adaptive Task Management and Prioritisation
[Agile Frameworks/Methodologies] Learn how adaptive teams prepare and carry out tasks: refining the backlog, writing success criteria for a task, ordering work with techniques such as MoSCoW and value-versus-effort ranking, and moving tasks to done on a task board.- Write acceptance criteria that define success for an adaptive task and distinguish them from the definition of done
- Prioritise a small backlog using MoSCoW and using business value against effort
- Describe the steps of breaking a story into tasks, having team members pull them, and tracking them to completion
- Level 34: What Business Analysis Is and What the Analyst Does
[Business Analysis Frameworks] Learn from first principles what business analysis is (identifying business needs and recommending solutions that deliver value) and the responsibilities a business analyst carries across the life of a project.- Define business analysis, a business need, a requirement and a solution in plain words
- List the main responsibilities of a business analyst, from assessing needs through to evaluating the delivered solution
- Distinguish the business analyst's focus on the product and its requirements from the project manager's focus on delivering the project
- Level 35: Business Analysis Roles: Internal and External
[Business Analysis Frameworks] Learn the roles that take part in business analysis (process owner, product manager, product owner, project manager, sponsor, subject matter expert and end user) and how to tell internal roles from external ones such as customers, suppliers and regulators.- Describe what a process owner, product manager and product owner each contribute to business analysis
- Classify the stakeholders in a scenario as internal or external to the organisation
- Use a RACI chart to show who is responsible, accountable, consulted and informed for a business analysis activity
- Level 36: Choosing Communication Channels and Tools
[Business Analysis Frameworks] Learn how a business analyst selects the best way to communicate with each stakeholder, choosing between push, pull and interactive communication, formal and informal channels, and tools such as reports, presentations and collaboration platforms.- Distinguish push, pull and interactive communication and give an example of each
- Recommend the most suitable channel and tool for a stakeholder based on their needs, influence and location
- Identify common barriers to communication, such as jargon and assumptions, and how to reduce them
- Level 37: Why Communication Makes or Breaks Business Analysis
[Business Analysis Frameworks] Understand why communication is central to the analyst's work as the bridge between business stakeholders and the delivery team, using active listening, facilitation and feedback loops to build shared understanding and prevent costly misunderstood requirements.- Explain how a misunderstood requirement leads to rework and why the cost of fixing it rises the later it is found
- Apply active listening and confirm understanding by paraphrasing in a stakeholder conversation
- Choose the best response when two stakeholder groups hold conflicting expectations of the same solution
- Level 38: Types of Requirements
[Business Analysis Frameworks] Learn the categories requirements fall into (business, stakeholder, solution (functional and nonfunctional), transition, project and quality requirements) so that each statement gathered can be classified correctly.- Classify a given requirement statement into the correct requirement type
- Distinguish a functional requirement (what the solution does) from a nonfunctional requirement (how well it does it)
- Explain what transition requirements are and why they are only needed temporarily
- Level 39: Elicitation I: Interviews, Workshops and Focus Groups
[Business Analysis Frameworks] Learn the conversational techniques for gathering requirements (interviews, facilitated workshops, focus groups and brainstorming), how to prepare for and run each, and how to match the technique to the situation.- Describe how interviews, facilitated workshops, focus groups and brainstorming differ in purpose and participants
- Prepare open and closed questions for an elicitation session and explain when each kind is useful
- Select the best conversational technique for a scenario, such as resolving cross-department differences quickly
- Level 40: Elicitation II: Observation, Documents, Surveys, Prototypes
[Business Analysis Frameworks] Learn the techniques for gathering requirements without relying on conversation alone (observation or job shadowing, document analysis, surveys and questionnaires, and prototyping) and how to combine them for a complete picture.- Explain when observation reveals needs that stakeholders cannot or do not put into words
- Choose between document analysis, a survey and a prototype for a given number of stakeholders, timescale and level of uncertainty
- Match a described situation to the best elicitation technique and explain why the other options are weaker
- The learner can describe what a use case is, distinguish it from a user story, and choose which of the two best documents a requirement in a given scenario.
- Level 41: Business Analysis in a Predictive Project
[Business Analysis Frameworks] How a plan-based approach shapes business analysis: requirements are elicited, documented and approved up front, then held as a baseline that only changes through formal change control.- Explain why a predictive project defines and approves most requirements before build work starts, and what a requirements baseline is
- Describe what a requirements management plan sets out and how a requested requirement change travels through formal change control
- Choose the best business analysis action in a scenario where a stakeholder asks for a new requirement after the baseline is approved
- Level 42: Business Analysis in an Adaptive Project
[Business Analysis Frameworks] How an adaptive approach shapes business analysis: requirements emerge and are refined just in time as backlog items, with analysis work carried out continuously alongside the product owner and team.- Contrast up-front requirements documentation with progressive elaboration of requirements through backlog refinement
- Explain how business analysis work is shared with the product owner and delivery team on an adaptive project, even when nobody holds the title of business analyst
- Decide, from a scenario's clues about uncertainty and change, which style of business analysis fits and justify the choice against the distractors
- The learner can explain what a product roadmap is, what it shows (vision, themes, features and releases over time) and how a business analyst uses it to align stakeholders and guide requirements work.
- The learner can assign features or components from a scenario to the correct releases on a product roadmap, based on priority, value and dependencies.
- Level 43: Tracing Requirements with a Traceability Matrix
[Business Analysis Frameworks] How a requirements traceability matrix links each requirement back to the business need it serves and forward to the deliverable and test that satisfy it.- Read a simple requirements traceability matrix and say what each column tells you
- Trace backward to spot a requirement with no business justification and forward to spot a requirement with no deliverable or test
- Use traceability to assess the impact of a proposed change and to detect scope creep in a worked example
- Level 44: Acceptance Criteria and the Definition of Done
[Business Analysis Frameworks] How to state, before work begins, the testable conditions a requirement must meet to be accepted, and how those conditions differ from a team-wide definition of done.- Write clear, testable acceptance criteria for a requirement or user story, and rewrite vague criteria so they can be checked
- Distinguish acceptance criteria, which apply to one item, from the definition of done, which applies to every item
- Distinguish verification (was it built correctly?) from validation (was the right thing built?) in exam scenarios
- Level 45: Validating Requirements Through Product Delivery
[Business Analysis Frameworks] How delivered work is confirmed against requirements and the original business need through reviews, demonstrations and user acceptance testing, ending in acceptance or a managed gap.- Explain how demonstrations, iteration reviews and user acceptance testing each confirm whether a delivered product meets its requirements
- Determine whether a delivered product or increment is ready for acceptance by comparing results with its acceptance criteria and the business need
- Select the best next step when a delivered item fails validation, such as recording the defect, raising a change or returning the item to the backlog, depending on the approach in use
- Level 46: Quality and Integration Management Plans in Use
PMI's outline for the predictive domain asks the candidate to apply a quality management plan and an integration management plan. This lesson names the project management plan's component plans, shows what a quality management plan holds and how to act on one in a scenario, and explains integration management as the work of keeping every plan, baseline and change consistent from charter to closure.- Name the component (subsidiary) management plans and the three baselines that make up a project management plan, and say what each plan answers: scope, requirements, schedule, cost, quality, resource, communications, risk, procurement, stakeholder engagement and change.
- Describe what a quality management plan holds (the quality standards that apply, quality objectives and metrics, roles and responsibilities, the quality assurance and quality control activities and when they happen, and how nonconformance is handled) and distinguish it from the quality metrics and the quality reports it leads to.
- Apply a quality management plan in worked scenarios: given a short plan extract and a situation (a deliverable fails a metric, a standard is skipped, a team wants to drop an inspection), choose the action the plan requires.
- Explain project integration management in the course's own words as the project manager's work of unifying the parts: authorising the project with a charter, assembling the project management plan, directing the work, managing knowledge, monitoring against the plan, deciding changes through integrated change control, and closing the project or phase.
- Apply integration thinking in worked scenarios: trace how one requested change touches scope, schedule, cost, quality and risk, and pick the response that keeps the plans and baselines consistent rather than fixing one in isolation.
- Recognise how the exam asks about these: scenario questions on which plan answers a given question, and on the next step when work departs from the quality management plan or a change would affect several plans at once.
- Level 47: Timed Mock Exam: 100 Questions in 120 Minutes Timed mock
[All four domains] A timed mock exam of 100 original scenario questions in 120 minutes with a 70% pass mark, testing all four CAPM domains in proportion to their exam weights: Fundamentals and Core Concepts 36%, Predictive 17%, Agile 20% and Business Analysis 27%.
Access
Levels 1 and 2 are free to read, no account needed. Levels 3 and 4 are free with a free account. Every level, the podcast edition and the AI tutor come with All Access at £4.99/month or any Creator plan — see pricing.
More like this
- PMI Project Management Professional (PMP) Exam Prep
Prepare for PMI's PMP exam under the outline in effect from July 2026. You will work through all 26 tasks across People, Process and Business Environment, and…
Exam prep · PMP · Project & Service Management · Expert · 50 levels · 4 free · Professionally curated by levelupwith.com
- Leading Change: The People Side of Transformation
Learn to lead a new system, process or structure from first announcement to lasting adoption. You will build the case for change, map stakeholders and impacts,…
Course · Project Management · Project & Service Management · Capable · 17 levels · 4 free · Professionally curated by levelupwith.com
- Project Risk Management That People Actually Use
Learn to find, assess, own and report project risks so your risk register drives decisions instead of gathering dust. You will be able to set risk appetite, pl…
Course · Project Management · Project & Service Management · Capable · 18 levels · 4 free · Professionally curated by levelupwith.com
- Leading Your Team Through AI Adoption
Learn to run AI adoption in a team without losing people's trust. Using a running customer service and admin case, you will find good use cases, write a team A…
Course · Project Management · Project & Service Management · Capable · 17 levels · 4 free · Professionally curated by levelupwith.com
- Stakeholder Management: Mapping, Engaging and Reporting
Learn to find everyone your project affects, map their power and interest, and plan how to engage them. You will practise managing expectations, handling resis…
Course · Project Management · Project & Service Management · Capable · 18 levels · 4 free · Professionally curated by levelupwith.com
- Kanban and Agile Delivery: Flow, Metrics and Forecasting
Learn to design a Kanban board, set work-in-progress limits and make your team's rules explicit. You will also learn to measure flow, forecast delivery dates f…
Course · Project Management · Project & Service Management · Capable · 18 levels · 4 free · Professionally curated by levelupwith.com